Fire Mitigation Mode
Bidding software built for defensible space, fuel reduction, and insurance-discount work.
For operators doing Zone 0/1/2 clearing, hazardous fuel reduction, and post-fire cleanup. Built on the same platform that handles your standard Forestry Mulching and Land Clearing jobs.
Win More Jobs. Get Paid Faster.
Free · no signup needed
Founder pricing for the first 100 operators
Now live · Fire Mitigation Mode included at both tiers.
Five places fire mitigation bids slip through the cracks
The work doesn’t fit standard line items. And the standard workflow knows it.
01
Zone 0/1/2 work doesn't fit standard per-acre pricing
02
Photo documentation packages for insurance and HOAs are manual and time-consuming
03
CAL FIRE, Wildfire Partners, and IBHS certifications all want slightly different paperwork
04
Red-flag-day cancellations break your scheduling and your cash flow
05 · The margin killer
Selective work (saving the oaks) takes 1.3× longer but operators bid it at 1.0× anyway
How we built it
Fire Mitigation Mode is built into LandWorkPro
Not a separate product. A toggle on the standard bid form that changes what you’re bidding, and what the system calculates, captures, and packages for the customer and the certification packet.
Zone-based bidding
Zone 0 / 1 / 2 selectors with per-zone production multipliers so your crew-day math reflects the actual work.
One-tap photo documentation
Capture before/during/after photos by zone from the field. Bundled into a deliverable customers and adjusters can use.
Certification PDF packets
Generated automatically. CAL FIRE, Wildfire Partners, and IBHS templates included. No manual paperwork shuffling.
Selective work multipliers
Save Canopy 1.25× and Standard Selective 1.15× baked into the crew-day math, so saving the oaks doesn't blow your margin.
Photo Documentation Package
$250 add-on for GPS-tagged, time-stamped before/during/after photos formatted for certification packets.
Pile Location Awareness
Required field when push-and-pile clearing is selected, ensuring debris piles land beyond Zone 2 for fire safety.
Post-Fire Hazmat Flag
Required confirmation for post-fire cleanup bids, protecting operators from regulated-materials liability.
Production Intelligence Network
Your platform gets smarter with every job
Drag the slider to preview your future Intel tab. Pick a state to see operator-realistic data for your market.
Demo operator profile
Showing your platform at Month 6 of operation
Production Intelligence
0 of 10 insights active
Build your first bid to start populating your data
Where it fits
Built for contractors in California, Colorado, Texas Hill Country, and Pacific Northwest fire-prone regions
California (defensible space, CAL FIRE compliance). Colorado (Wildfire Partners certification). Texas Hill Country (cedar removal as fire mitigation). Plus Oregon, Washington, Idaho, Montana, Arizona, Utah, New Mexico.
Pricing
Same price as standard LandWorkPro
$29 Starter · $99 Pro. Fire Mitigation Mode included at both tiers.
Founder pricing: Pro at $49/mo for your first 12 months, for the first 100 operators.
Ready to bid your fire-mit work like a system?
Try the live demo, or see pricing and claim a founder spot.
Free · no signup needed
Founder pricing for the first 100 operators
Now live