LANDWORKPRO

Fire Mitigation Mode

Bidding software built for defensible space, fuel reduction, and insurance-discount work.

For operators doing Zone 0/1/2 clearing, hazardous fuel reduction, and post-fire cleanup. Built on the same platform that handles your standard Forestry Mulching and Land Clearing jobs.

Win More Jobs. Get Paid Faster.

Join the Waitlist

Free — get launch updates

Apply for Founding 100

$99 to lock $99/mo for life

Launches Fall 2026 · Fire Mitigation Mode included at both tiers.

Five places fire mitigation bids slip through the cracks

The work doesn’t fit standard line items — and the standard workflow knows it.

  • 01

    Zone 0/1/2 work doesn't fit standard per-acre pricing

  • 02

    Photo documentation packages for insurance and HOAs are manual and time-consuming

  • 03

    CAL FIRE, Wildfire Partners, and IBHS certifications all want slightly different paperwork

  • 04

    Red-flag-day cancellations break your scheduling and your cash flow

05 · The margin killer

Selective work (saving the oaks) takes 1.3× longer but operators bid it at 1.0× anyway

How we built it

Fire Mitigation Mode is built into LandWorkPro

Not a separate product. A toggle on the standard bid form that changes what you’re bidding — and what the system calculates, captures, and packages for the customer and the certification packet.

Zone-based bidding

Zone 0 / 1 / 2 selectors with per-zone production multipliers so your crew-day math reflects the actual work.

One-tap photo documentation

Capture before/during/after photos by zone from the field — bundled into a deliverable customers and adjusters can use.

Certification PDF packets

Generated automatically — CAL FIRE, Wildfire Partners, and IBHS templates included. No manual paperwork shuffling.

Selective work multipliers

Save Canopy 1.25× and Standard Selective 1.15× baked into the crew-day math, so saving the oaks doesn't blow your margin.

Addendum A — additional fields

Photo Documentation Package

$250 add-on for GPS-tagged, time-stamped before/during/after photos formatted for certification packets.

Pile Location Awareness

Required field when push-and-pile clearing is selected, ensuring debris piles land beyond Zone 2 for fire safety.

Post-Fire Hazmat Flag

Required confirmation for post-fire cleanup bids, protecting operators from regulated-materials liability.

Production Intelligence Network

Your platform gets smarter with every job

Drag the slider to preview your future Intel tab. Pick a state to see operator-realistic data for your market.

Demo operator profile

Showing your platform at Month 6 of operation

Illustrative — based on industry benchmarks. Your numbers will vary.

Production Intelligence

0 of 10 insights active

Build your first bid to start populating your data

3 jobs10 jobsNetwork
No jobs yet at this scrubber position. Try a later month or a different profile.

Where it fits

Built for contractors in California, Colorado, Texas Hill Country, and Pacific Northwest fire-prone regions

California (defensible space, CAL FIRE compliance). Colorado (Wildfire Partners certification). Texas Hill Country (cedar removal as fire mitigation). Plus Oregon, Washington, Idaho, Montana, Arizona, Utah, New Mexico.

Pricing

Same price as standard LandWorkPro

$99 Starter · $179 Pro — Fire Mitigation Mode included at both tiers.

$99 Founding 100 deposit, refundable until launch.

Ready to bid your fire-mit work like a system?

Lock the Founding 100 rate or join the free waitlist for launch updates.

Join the Waitlist

Free — get launch updates

Apply for Founding 100

$99 to lock $99/mo for life

Launches Fall 2026